Centrix The Station KLCC
A KLCC-fringe transit-oriented development directly above Dang Wangi LRT, offering flexible SOHO layouts, dual-key options and multi-level lifestyle facilities.
Integrated city living with direct rail access near KLCC.
Centrix The Station KLCC is planned as a single 47-storey tower with 857 SOHO suites on approximately 2.39 acres. Published layouts range from 571 to 1,187 sq ft across studio, one-bedroom, dual-key, two-bedroom and three-bedroom formats. The project is developed by Intan Sekitar Sdn Bhd, a Crest Builder subsidiary, with Prasarana Malaysia Bhd as landowner. Published packages differ between the supplied sources, so the selected unit, furnishing package, final price, parking rights and completion timing require reconfirmation.
Request current documentsLayouts & current availability
Compare confirmed sizes, room counts and published floor ranges, then request current plans, prices and unit status.
Swipe to compare all columns
| Layout | Built-up | Bedrooms | Bathrooms | Floor range | Guide price | Availability |
|---|---|---|---|---|---|---|
| Studio | 571 sq ft | Studio | 1 | Published range starts at 571 sq ft | RM907,800 | Check latest units |
| 1BR / 1BR + Study | 578 sq ft | 1 | 1 | Published range starts at 578 sq ft | Request latest price | Check latest units |
| Dual Key | 593 sq ft | 1 | 2 | Published range starts at 593 sq ft | Request latest price | Check latest units |
| 2BR | 718 sq ft | 2 | 2 | Published range starts at 718 sq ft | Request latest price | Check latest units |
| 3BR | 1,001 sq ft | 3 | 2 | Published range starts at 1,001 sq ft | Request latest price | Check latest units |
A quick decision frame before you compare units.
Decide whether Centrix The Station KLCC belongs on your shortlist, then verify the exact unit and documents.
The location, tenure and space fit your brief.
Use the published project facts to shortlist it before comparing a specific unit.
Compare the published layout range.
Published layouts range from 571 to 1,187 sq ft.
The exact unit matters more than the starting price.
Reconfirm floor, view, parking, net price, payment schedule and whether maintenance includes sinking fund.
Picture the space, then read the plan.
Use the project image for spatial context and the published floor plan to read the layout. Reconfirm the selected unit’s view, orientation and specifications.






What is actually nearby?
Review practical drive times, then open the live route to check current traffic before arranging a viewing.
Distances follow the official project brochure. Drive times are off-peak planning estimates; open the live route for current traffic.
Plan beyond the sale price.
Adjust the assumptions below to estimate financing, monthly commitment and common purchase costs before speaking with a banker or lawyer.
This does not by itself confirm approval or ineligibility. Ask a lawyer to verify the selected unit, State consent and applicable fees before booking.
Assumptions, exclusions and references

KC Khaw
Real Estate Negotiator · REN 66837A direct point of contact for project comparison, current unit checks, document requests and private viewing arrangements.
Understand the buying context, not only the project.
Follow the next relevant guide. Each link answers a different question buyers commonly ask before booking.
Foreign Buyer Guide
Review property thresholds, the acquisition process and common buyer costs.
Read guide →DUE DILIGENCE7 checks before buying a new launch
Check the developer, APDL, project status, written unit details and full ownership cost.
Open checklist →LOCATION CONTEXTHow to read Kuala Lumpur location data
Connect employment, commute, supply and liveability before treating location claims as an investment signal.
Read analysis →Get current unit availability.
Share your budget, purpose and preferred layout. I will check the more suitable units, current asking references and available documents.
Reviewed information and what to reconfirm.
A concise record of the review date, source scope and selected-unit details that still require confirmation.
Based on project information and public references available on the review date.